December 2024

Verification of fish pass functionality at the Nedakonice profile, river km 137.021, Morava River

Rybí přechod Nedakonice / Česko

December 2024

Hydrometric measurements on the Rajčanka stream

Kofola ČeskoSlovensko a.s.

Ostatní Rajec / Slovensko

December 2024

Assessment of the plan on the right-bank Zubersky millrace (river km 14.00-0.00), focused on ichthyofauna, mussels and crayfish, including riparian vegetation management and authority consultations

ENERGOAQUA, a.s.

Přírodovědný průzkum Zubří / Česko

December 2024

Design of water-retention measures and professional supervision of implementation in Rajecká dolina

Kvapka Rajeckej doliny, n.o.

Vodozádržné opatření Rajec / Slovensko

December 2024

Biological survey focused on aquatic and water-dependent organisms, Bila voda watercourse, Loucna pod Klinovcem complex

Přírodovědný průzkum Loučná pod Klínovcem / Česko

December 2024

Assessment of the impact of mill race repairs in Vsetín on the thick-shelled river mussel (Unio crassus)

Město Vsetín

Přírodovědný průzkum Vsetín / Česko

December 2024

Ichthyological survey - access route to the Mlade Buky small hydropower plant, Upa

Přírodovědný průzkum Mladé Buky / Česko

December 2024

Monitoring - assessment of fish pass effectiveness at the Doksany weir

Povodí Ohře, státní podnik

Rybí přechod Doksany / Česko

December 2024

Ichthyological survey - access route to the Srub small hydropower plant, Upa

Přírodovědný průzkum Svoboda nad Úpou / Česko

December 2024

Functionality check of the ELZA II electric fish deterrent at Doksany